NCS finished construction on the site campus for Elida High School. The scope of work was lengthy and included high production items such as roadway curb and gutter, sidewalk, and specialty work including a seat wall and wood-float finished walks. The job was performed over a 3 month period and really demonstrates the diversity that NCS is capable of. Because of the sheer size of this project there were up to 3 crews working on this job at any given time. Touchstone was the Construction Manager and R.D. Jones was the General Contractor. The quality of work performed by NCS is exemplary and has driven rave reviews from all participants.