The Ohio State University

 

NCS  featured in Ohio Concrete

click here for article 

Go Bucks!O-H-I-O

Neil Avenue: NCS’ work on the Neil Avenue Improvements was completed in the Fall of 2002.

The project consisted of:

1,942 sy         8” Pavement

1,750 lf         6 x 18 Curb

10,840 sf     5.5" Concrete Sidewalk

288 lf            12 x 18 Curb

9 ea                Handicap Ramps

2 ea                Concrete Medians

 

Cannon Drive S-Curve: NCS’s work on Cannon Drive South Curve was completed in the Fall of 2004. NCS self performed the removal and replacement of all existing sidewalk, pavement, and curb.

The project consisted of:

15,750 sf        10” Reinforced Pavement

1,440 lf         2’ Wide 10”T Curb & Gutter

1,950 sf          5.5” Sidewalk

click here for pictures

South Oval Underdrain: NCS’ work on South Oval was completed in the Fall of 2005.

The project consisted of:

Phase I:        Install pipe, stone, & rough grade

Phase II:      Fine grade, rock hound,                         hydroseed, fertilize, and mulch

Baker Hall 11th Avenue: NCS’ work on Baker Hall 11th Avenue was completed in the Fall of 2005.

The project consisted of:

474 sf         4” walk

 

Bike Trail: NCS’ work on the OSU Bike Trail was completed in the Fall of 2006.

The project consisted of:

3,657 sy        Subgrade Compaction

30 ea             Linear Grading

3 ea                Bollards

8 ea               Guard Posts

33 cy             Rock Channel Protection

6,620 sy       Seeding and Mulching

8.14 cy          Concrete Masonry

40 lf               12” conduit, type b

80 lf              24” conduit, type b

 58 lf              36” conduit, type b

40 lf               6’x3’ conduit, type a

610 cy           304 aggregate base

370 cy           Asphalt

252.05 cy     #1 Aggregate Base

Clearing and grubbing, temporary soil erosion, traffic maintenance, and construction layout were also performed on this project.